PR-186-113718-R01 Facility Integrity Management Program Guidelines
$100.00
PR-186-12204-R02 Guidelines on the Effects of Ethanol on Pump Stations and Terminal Facilities
$1,000.00
PR-186-12204-R02A Effects of Ethanol on Pump Stations and Terminal Facilities - Materials Tables
$50.00
PR-186-123715-R01 State of the Art for Subsea Pipeline and Equipment Life Extension
PR-186-123716-R01 Analysis of Line Pipe Manufacturing, Materials, and Construction Practices
$250.00
PR-186-124502-R01 Guidelines for Interpretation and Application of API 1104 Twenty-First Edition
$295.00
PR-186-124510-Z02 Pipeline Lifting and Lowering-in Stress Application Tool
$0.00
PR-186-133605-R01 Internal Corrosion Sample Collection Guidelines
PR-186-163606-R01 Establishing the Potential Severity of Various Cathodic Protection Shielding Parameters
$500.00
PR-186-183825-R01 Continuous Improvement of ILI Capabilities Joint Industry Project (Phase I)
PR-186-184508-R01 Post-Heating as an Alternative to Delayed Nondestructive Examination
PR-186-184509-R01 Guideline for Erosional Velocity