{"product_id":"l51699-diverless-pipeline-repair-clamp-phase-iii","title":"L51699 Diverless Pipeline Repair Clamp Phase III","description":"\u003cp\u003eOffshore oil and gas developments are underway for water depths beyond which divers can function. The economic lifelines of these projects are the pipelines which will transport the products to shore. In preparation for the day when one of these pipelines will require repair because of a leak, the Pipeline Research Committee of Pipeline Research Council International, Inc. is funding research directed at developing diverless pipeline repair capabilities.\u003c\/p\u003e\n\n\u003cp\u003eThis Report summarizes the results of the third and final phase of this project. Phase III work included design, manufacture, and dry testing of 1) a one-half scale model of a 12\" repair clamp, 2) a full-scale bolt test fixture to demonstrate boltcontainment and startup under realistic misalignment of the clamp halves, and 3) a full-scale one-way cylinder for end seal activation. Engineering drawings for a 12\" - 900# (324 mm, 15.3 mPa) diverless repair clamp package were also produced, and are provided with this report in Appendix B. Phase III also included a study commissioned from Oceaneering directed at defining the interfaces of the clamp package and the ROV, including suggested procedures for deployment and positioning of the clamp package on the pipeline. Issues regarding bolt make-up by the ROV were also studied in detail and limitations in bolting capability were outlined.\u003c\/p\u003e","brand":"PRCI Store","offers":[{"title":"Default Title","offer_id":44361998172238,"sku":"15323","price":849.0,"currency_code":"USD","in_stock":true}],"url":"https:\/\/prci-store.myshopify.com\/products\/l51699-diverless-pipeline-repair-clamp-phase-iii","provider":"PRCI Store","version":"1.0","type":"link"}